11 published fees · grocery/mass · newest source document 2012
Source links go to a copy republished by www.land-link.com — Meijer's own public copy of this document could not be located. Verify against the retailer's current document before relying on any figure.
Quoted from Meijer's own publicly posted vendor documents. Where a figure is not published, it says so rather than guessing.
| Violation | Published fee | Effective / version | Source |
|---|---|---|---|
| Foreign object (e.g. tire) on produce trailer causing rejection | $2,000 per shipment | December 2012 | source |
| No-show or late for delivery appointment requiring reschedule | $500 per shipment | December 2012 | source |
| Dry-freight layover | $350 per shipment | December 2012 | source |
| Produce layover | $350 per shipment | December 2012 | source |
| Produce load truck order cancelled within 24 hours of ship date | $300 per shipment | December 2012 | source |
| Missing ETA on produce load before 9:00 AM EST | $100 | December 2012 | source |
| Produce additional pickup or drop-off location beyond the one included in rate | $75 | December 2012 | source |
| Dry-freight truck detention beyond free time | $50 cap $300 | December 2012 | source |
| Dry-freight multi-vendor pickup / multi-stop delivery stop-off | $50 | December 2012 | source |
| Produce truck detention at loading/unloading | $50 cap $350 | December 2012 | source |
| Paper invoice submitted instead of electronic | $25 | December 2012 | source |
| Carrier/vendor-caused out-of-stock | not published as a figure | December 2012 | source |
| Delivery made on unacceptable pallets | not published as a figure | December 2012 | source |
| Prepaid delivery unloading exceeds two hours | not published as a figure | December 2012 | source |
| Protective service (temperature-controlled dry freight) accessorial | not published as a figure | December 2012 | source |
| Dry-freight pickup cancelled after driver dispatched | not published as a figure | December 2012 | source |
| Produce team-driver service required | not published as a figure | December 2012 | source |
| Accessorial request denied for LeanLogistics non-compliance | not published as a figure | December 2012 | source |
| Load tender not accepted or rejected within required window | not published as a figure | December 2012 | source |
| Carrier performance scorecard below expected threshold | not published as a figure | December 2012 | source |
| Bill of Lading documentation requirements | not published as a figure | December 2012 | source |
| Freight claim response deadlines lapse (deemed valid) | not published as a figure | December 2012 | source |
| Freight claim dispute window (initial claim) | not published as a figure | December 2012 | source |
| Debit memo dispute window (post-deduction, via CMS) | not published as a figure | December 2012 | source |
| Trailer seal not intact on arrival | not published as a figure | December 2012 | source |
No violation matches that wording. The filter is a literal text match against the retailer's own words — try a term from the document (“hazardous material” rather than “hazmat”), or clear it to see all 25 rules.
Their fee schedules are not published anywhere, so they can only be learned from chargebacks suppliers actually receive. That may never be something we can cover — leave an email and you'll hear if it changes.